20 Meter Long Lead

20 Meter Long Lead

Sale price  £19.99 Regular price £29.99
Skip to product information
20 Meter Long Lead

20 Meter Long Lead

Sale price  £19.99 Regular price £29.99

This 20 Meter Long Lead is designed with reflective material for increased visibility and is made with strong, durable materials for long-lasting use. Ideal for long walks or training sessions, this lead provides both safety and convenience for you and your pet.

Why we like it

  • Designed for dogs
  • From the North East Pets range

Product details

  • Brand: North East Pets
  • Suitable for: Dogs
  • Product type: Dog Harnesses

Sizing & fit

Check the manufacturer’s sizing guidance before ordering. Adjust for a secure, comfortable fit without restricting normal movement, and inspect straps, fastenings and fittings regularly.

Good to know

  • Measure before ordering where sizing applies
  • Recheck the fit regularly as your pet grows or changes shape
In-store availability
Stock levels can vary between our website and our Hebburn store. If you’re making a special trip for a particular product, we recommend checking availability with us first.

You may also like